GOG_Booklet07_170424 - page 122-123

LED Lamps Replacement
In the main office,
entrance lobby and office
floor corridors of ICC most
of the damaged lights
were replace by LED tube,
MR16, LED Down light.
Use of Timers and
Sensors
Install timers and sensors
to control lighting in areas
not covered by the BMS.
Reschedule of Operating
Hours
Switch off lighting on
mechanical floors.
Lighting schedule adopts
operating schedule.
De-lamping
Reduce excessive lighting
in common areas such as
lift lobbies.
Mechanical
Floor
Office Floors
De-lamping inside
VIP lobby
De-lamping inside
Lift lobby
Use of
Timers and
sensors in
plant rooms
Figure 4.1.29 Electrical Lighting System
(Source: Kai Shing Management Services Limited)
Electrical Lighting System (2
nd
Energy Source)
Office
BUILDING
Lift & Escalator System (3
rd
Energy Source)
LED lamps
Replace lift car spot lamps
with LED lamps in all lift
cars.
Make Use of the
Staircase
Encourage staff and
tenants to walk
between floors.
Suspension of Lifts & Escalators
During non-peak hours and
holidays.
• Zones 1 – 5: office and shuttle
lifts
• Levels 1,2,3,8,9,48 and 49:
escalators
Figure 4.1.30 Lift and Escalator System
(Source: Kai Shing Management Services Limited)
OPERATION AND MANAGEMENT STAGE
4.1.6 Maintain Energy Efficiency
Benefits for Office Building
An
can encourage the
building owner to explore more
energy saving strategies.
Building
benefits office
buildings in several ways:
• Improvement of energy efficiency
• Improvement of product cost
• Good reputation for customers on
environmental sustainability
Benefits for Office Unit
An
can encourage the
unit owner to explore more energy
saving strategies.
z
Compare the utility usage with
historical data andbenchmarking
z
Regular preventive maintenance
of equipment to increase system
efficiency
Overview
To promote energy saving, The Government of the HKSAR enacted the
Buildings Energy Efficiency Ordinance (Chapter 610) and all new office
building designs need to comply with the Building Energy Code published
by the Electrical and Mechanical Services Department (EMSD). In
addition,
for existing buildings also become mandatory.
However, the coverage of an audit is confined to the landlord’s areas.
Even though some energy saving opportunities (called EMOs) can be
identified through the
, the implementation of the auditor’s
recommendations is not required under the Ordinance.
Green Strategies for Office Building
Green Strategies for Office Unit
z
Proper preventive maintenance
of equipment to avoid dropping
of operating efficiency
z
Compare the system efficiency
with historical data and bench-
marking
Office
UNIT
Office
BUILDING
Pre-audit
data
collection
Audit
detailed
measurement
Data
analysis
Suggestion for
implementation
OPERATION AND MANAGEMENT STAGE
4.1.7 Energy Audit
120